Back in 2005, Ancor teamed up with Patti Engineering to create a label packaging line and the line has been running ever since. Over the years, Patti Engineering has completed minor upgrades on the line, but the majority of the original hardware and software was still being used 15 years later.
Ancor wanted to increase production, but was finding that the aging line was running over 30% slower than it has in the past. This led to an investigation by the Patti Engineering team to find the root of the problem and ultimately get the line back running at the necessary rate.
Challenge
Solution
Results
MORE RELATED ARTICLES
Related Posts
Engineering Study to Develop a Vial Dispense and Testing Solution
Recently, a leading manufacturer of medical diagnostic devices had an issue with one of their production lines. An integral verification station was a general bottleneck...
Implementing Plant Standards for a new Leak Test System
A local automotive manufacturer purchased three leak test systems from an OEM. The systems follow a turn-key, plug-and-play methodology where the equipment is completely standalone...