Nick Hitchcock | When Patti Engineering embarks on a project, it is often done with the intention of leaving future pathways open. Upgrading technology can offer more possibilities than the budget allows at […]Read More
Nick Hitchcock | Recently, the City of Fair Oaks Ranch in Texas took advantage of the possibilities that were afforded to them by a technology upgrade a few years earlier. The way we […]Read More
Terrance Brinkley | Lathrup Village is only allowed a certain amount of sewage flow, so two 1 million gallon retention tanks are utilized on an as-needed basis to hold excess sewage during periods […]Read More
Nick Hitchcock | With the growth of IIoT (industrial internet of things), many people are looking to get access to their system and their data wherever they are.Read More
Terrance Brinkley | The Tennessee Valley Authority (TVA) Wilson Dam was built in 1924 and is the largest hydroelectric plant in the TVA power system.Read More